Construction update: Furniture starts to move in to Victoria East library

This is the back entry way of Victoria West High School. Additional sidewalks were recently poured on the north and south side of the campus.

Construction continues at the two new high schools and middle school in Victoria.

All three schools will open in August.

Victoria West High School, Cade Middle School

Started rubbing concrete columns at high school.

Poured flag pole sleeves at high school and middle school.

Finished gym locker installation area H at high school.

Poured and finished slab openings at high school.

Continued installing HVAC grilles in finished grid on first, second and third floors at high school.

Installing lab and millwork counter tops on second and third floor.

Continued installing library ceiling, second and third floor acoustical ceiling grid complete, area E 75 percent complete at high school.

Finished third floor light fixtures, second floor 98 percent complete, installed light fixtures in kitchen and area E and finished stage lights and power to rigging equipment at high school..

Started gym wood floors at high school.

Continued plumbing fixtures in area H, fume hood connections and installed vent piping in mechanical rooms.

First floor tape and float, caulking and fire tape third floor complete, second floor 65 percent complete at high school

Poured additional sidewalks on north and south side of high school.

Finished installing curtain rigging in high school auditorium

Poured additional sidewalks on north and south side of high school.

Finished installing curtain rigging in high school auditorium

Insulation on second and third floor complete, boiler room insulation complete at high school.

Installed door glass in exterior storefront doors, started installing door closers, installed storefront system in opening A156.

Finished court striping and started first coat of urethane finish at middle school.

Received ceiling cover inspection from City of Victoria in areas C and D at middle school.

Installed ceiling tile in flex circulation and areas C and D.

Finished added wainscot in corridors at middle school and continued miscellaneous patches and detail work including transition strip installation.

Continued installing display cases at middle school.

Continued installing acoustical wall panels in band hall area C at middle school.

Door hardware in areas C and D at middle school.

Started second floor punch list.

Installed projector mounts.

Painted administration concrete columns.

Continued landscape sprinkler system.

Stated mowing site.

Victoria East High School

Completed final clean in area H.

Installed ceiling tile in area G.

Completed final clean in area G.

Installed serving line, MEP to serving line, ceiling tile in kitchen/ cafeteria.

Installed ceiling grid, light fixtures/ ceiling devices in area E.

Completed above ceiling prep rooms, ceiling tile prep rooms, final clean in areas A, B, C, D on third floor.

Installed above ceiling prep rooms, ceiling tile prep rooms in areas A, B, C, D on second floor.

Completed tape/ float/ prime walls, ceramic/ wainscoat tile, millwork on first floor classrooms.

Completed entry 101 windows interior on first, second, third floors.

Continued to install light fixtures, tectum panels in library, began putting in library furniture.

Put in final grade at sidewalks, irrigation system, began landscape planting.